Brief Description: REASSEMBLED VERT STAB FOR RIVETING
(1) I reassembled the vertical stab with clecos in preparation for riveting. checked alignments and verified angle one more time. I took my rivet schedule drawings from the manual over to kinkos, and had them enlarged. (2) Using a felt tip marker, I carefully color coded the rivets that would be used in assembling the vert stab. I marked the rivet numbers, quantities, and color code below the drawing for quick reference. I feel ready to tackle the riveting.